Showing posts with label contractors. Show all posts
Showing posts with label contractors. Show all posts

Wednesday, April 29, 2009

Courtyard Foundation Complete

oh hai

As you can tell by my elation in this pic, the concrete work in the back is done. I think the walls help to cozy up the space, and I'm glad to have some decent looking planting beds and a concrete pad that isn't buckling up. It looks 342% better.

Before

_MG_1620

After

_MG_1671

The yard feels much larger, and despite it being gray block I like the feel of it. Some folks have suggested painting the block, but I like it the way it is. Frank Lloyd Wright was able to use concrete as a main material, and by mixing in other materials and textures was able to bring warmth to the space. This is what I'm hoping to do. I like the industrial/modern look of the material so I'm hoping to embrace it rather than attempt to hide it.

_MG_1674

The raised beds in the back and on the side help to break up the space, and once I get some plants in it will help to add texture to the space. Wally has even gotten used to hopping in the bed to do his business, so once we fill it with dirt he is going to be one happy pup. Seeing as I used to own a landscape design company through college I'm excited to be able to have plants again. The current plan for plants is to use a Bloodgood Japanese Maple, some boxwoods, and black mondo grass. I'm not showing you the details on this yet. You'll have to be patient. :-)

_MG_1675

The area around the A/C unit has 4 pressure treated posts set into the concrete. I'll pick up some lumber within the next couple of weeks and create a fence around this area to hide the unit, garbage cans, and any other crap that would otherwise clutter up the space. I'm still pondering over the fence and back gate design. I want it to have a modern look, but I want it to be easy to build. I'm also still debating what material to make the gate corral area out of. While I love the look of cedar and redwood, costs can be high and they require maintenance. The other end of the spectrum is pressure treated lumber, but I'd still have to stain it and deal with maintenance. I'm leaning toward material like trex, as it will have better strength properties that will resist warping and there is zero maintenance on the product.

I'm sure most folks would look at the back yard and would want more greenery and the open space that a place like the suburbs would provide, but for a yard in the city I am very pleased. I feel as if we've created an extra 450 sq ft of living space out of nothing. When you've only got 1300 sq ft to start with this feels like a big deal.

Monday, April 20, 2009

The Queen is Amazing

After getting a few bids on the backyard, we finally signed a contract. The work starts Wednesday. The design is approaching something that resembles Design B.

backyard with garbage with AC

Design B


There were pros and cons for either keeping the trash near the alley or near the house, but with bids coming in higher than we decided to go with the cheaper option and put it closer to the house. It's easier to get to in the winter and allowed us to delete the 4' block wall near the alley. Summer said Bmore may be switching one 64 gallon trash can pick up per week, so the enclosure is sized for 2 of my garbage cans, or 1 new larger can, and my recycle bin. Other cost cuts included removing the few steps up into the planting bed, and the counter top area. It pained me to remove the counter area from the design, but in a tough economy it's tough to add design details that may not return your investment. This renovation hasn't been about making money, but we don't want to throw it away.

I'm exicted for the work to begin on Wednesday. The contractor said he thinks he can be done by the weekend. I seriously doubt he'll complete the job of laying all the masonry walls, hammering half of the back pad out and re-pouring this section of the pad. That's ok though. He may not be done by this weekend, but I'm pretty confident by next weekend the backyard will be looking much better.

Tuesday, December 23, 2008

Contractor Woes

Sometimes relationships come to a breaking point. There comes a time that you cannot see eye to eye, and either you accept the issue or you find someone else. This is true in relationships with contractors too, and we are leaning toward the latter behavior.

The kitchen contractor did a great job and was very understanding about us living in the house at the time of renovation. He was a very nice guy that I shared a lot of interests with. However, he had a tendency to not estimate add-ons in advance. When I got the final bid it had exorbatent prices for the add-ons, and some things which I considered in scope, he considered out of scope. I got pissed, paid the final bill and bid him adieu. He gave us an estimate for finishing off the rest of the house, which again was extremely high. Needless to say, he did not win this job.

For the upstairs bathroom we had someone else come in to help. He did a good job, though everything took much longer than expected. He was great with trading scope and was nice to work along with. However, in the past week he agreed to work and the day of or the day prior has continually come up with reasons not to work. Of a potential 40 hours to work, he worked 10. I don't like someone commiting to something and then backing out. We need things done. We are having someone else to possibly help finish things up, so hopefully they work out better. If they do, we'll get to part ways with our current guy.

For better news, we are now proud parents of a beautiful yellow boy. I name him Dewey.