Between bouts of eating turkey over the holiday we got some work done on the house. Luckily, this weekend was more productive than the last one. The main things accomplished were finishing up shelves for the new linen closet in the bathroom and staining the stair edging.
The teak floors have been sitting in the dining room since July. With all the other dirty work they haven't been a priority, but with the dirtier work is nearing an end we're focusing on the floors again. We didn't purchase stair nosing when we bought the wood, and par for the course, the wood in the stain we purchased has been discontinued. Similar pre-finished woods were running $9-13 a linear foot, we have 60 linear feet, and the finishes didn't match our wood anyways. I don't like paying astronimical prices for items that don't even match, so we decided to buy some $4 a linear foot unfinished maple and stain it ourselves. This weekend has been an interesting experiment of trying various wood stains on the nosing we bought. So far we are pleased with the match, but there are still 3 coats of polyurethane to put on the wood.
The wood shelves went into the linen closet ok. I had some leftover plywood laying around, so I used that for the shelves. On the front edge I used the finish nailer to add a piece of trim to give a cleaner and more durable edge. The shelves were then primed and painted, and are looking ab fab in the closet.
Other things accomplished this weekend were getting the foundation issue fixed, eating turkey, building some shelves for the basement, repairing the upstairs sink, sitting in front of a fire drinking irish whiskey, and going to the dump to rid ourselves of building supplies. Not too shabby.
Sunday, November 30, 2008
Tying Up Loose Ends
Posted by
Corey
at
11:37 PM
2
comments
Labels: Baltimore, closet, rowhouse, stairs, upstairs bathroom, wood floors
Monday, November 24, 2008
Non-Productive Weekend
After spending all Sunday toiling on projects, I feel like I got nothing accomplished.
I worked on insulating the front door. You see, when I replaced the front door this summer it took many passes with the power planer to make it fit. Seeing as nothing is level in the house, and I didn't want to cut up the beautiful trim around the door, we chose to use a wood door and trim it to fit. Apparently I went a little crazy with the planer on the bottom, and opened up a sizeable gap under the door. I also used a very thin threshold, which resulted in water running off the door and into the house. Not good. Fixing this was a monumental task that involved a new threshold, more power planing, a hacksaw, and a multitude of other tools and the better part of a day.
The door no longer has a screaming gale coming through it 24/7, but I must admit the door takes a bit of an effort to shut with all the sealer around it. There are a few more small gaps to fill in better, but it got cold so I headed inside for the day.
I then worked on installing shelves in the linen closet in the bathroom. The shelves are trapeziodal in space, and again the walls are not plumb or square. Also, I have no idea what some of the drywall is attached to, because in my flurry of drilling I couldn't find a stud in some areas. Each shelf and support is custom cut, anchored and attached, creating way too much work for such a minor project.
Also, the new tub's plumbing was leaking and the coldwater line to one of the vanity sinks is busted. Of course fixing these isn't straight forward either. Overall this weekend was a frustrating experience, and unfortunately each of the tasks I started weren't completed.
*sigh*
Posted by
Corey
at
10:38 AM
3
comments
Labels: Baltimore, exterior, houseblogs, renovation, rowhouse, upstairs bathroom
Monday, November 17, 2008
Upstairs Bathroom Lessons Learned
After each major project I want to write a Lessons Learned post about the mistakes (and a few successes) made along the way, and how we dealt with them. You can take a look at my past half-assed attempts by clicking on the posts tagged lessons leared.
Also, deciding to tile the front of the tub and the niches with slate meant we were two floor tiles short. Luckly Home Depot was able to get the tile for us quickly. Moral of the story, make sure you have enough trim and buy plenty of extra tile (or plan better) and be wary of buying a specialty color/type of tile, as purchasing additional tile may be tricky. In the end, all is well as we spent about $600 on all the tile in the room, which is pretty cheap considering how it all came out.
We also did the quote as labor only, as we had already purchased the materials. If you are using high end materials, realize it might be better to pick out yourself and price separately as it is just too hard for a contractor to bid the job.
The color temperature is easy to fix. I did some research and found our bulb is a 3500K bulb, which is a cool-bluish white. Not appealing in the bathroom, as it casts a ghostly bluish pallor to the sking. We want a 2700K bulb, which is a tungsten balanced bulb that puts off the warm and cozy orangish glow we are used to.
The issue of being dim when it starts up is more complicated. Looking up the light I found it's spec sheet. After skimming through a lot of gobbly'd'gook I finally found evidence of what I was looking for on page 6. This page shows a graph of lumen output as a function of time. At start up, this bulb only puts out 20% power, and take 2-3 minutes to come up to full power! If you are just going in to use the bathroom quickly, this is far too long to wait. Since the bulb is 4 pin, it requires an electric ballast be installed in the light for it to work. Now I don't know if the poor light output at start-up us due to the light, or to the ballast. With lights running at around $10 a pop plus shipping I am not excited about ordering new bulbs only to find out they take just as long to get bright. I wish I would have just gone with a normal incandescent fixture and fit it with a CFL. :-(
I read up on prepping subfloors in Tile Your World, and even looked at John Bridge's Tile Forum. I suggest checking both resources before tiling a floor. He recommends a floor that has deflections less than 1/320 for ceramic tile and 1/720 for natural stone. My floor is slate, so I knew it had to be stiff.
After demo'ing the room I stepped in spots and could feel the floor deflecting below my feet. While the Deflect-O-Later said I was ok for tile, the deflections I felt told me otherwise. I had just planned to add a layer of subfloor over top of my floor, but after feeling this we decided to rip out the old subfloor and sister the joists and add cross bracing to stiffen up the area. Also, we laid new subfloor and 1/2" hardiebacker cement board on top. I am very glad we took this step, because if not it could have been a very expensive thing to fix down the road, as the entire room would have to be ripped up.
If I think of more things in the future, I'll just add to this post.
Posted by
Corey
at
11:05 AM
3
comments
Labels: Baltimore, houseblogs, lessons learned, renovation, rowhouse, upstairs bathroom
Sunday, November 16, 2008
Master Bath Reveal
I've been pretty mum lately about the bathroom renovation. This doesn't mean work hasn't been accomplished, rather I figured I'd hold off on showing pictures until it was done. As of 10:30 tonight, it's pretty well done.
Not too long ago, the bathroom looked like this.
The bathroom stayed like this for months and months while other things got worked on. A lot has been accomplished. Just not in the bathroom. :-) Around Mid-October we decided we could use a bit of help on the bathroom, seeing as it is the only full bath in the house, and brought in a contractor to help things along. After all these months we kept things in the spirit of our design board, though there have been a few changes along the way.
Now it looks a wee bit better. Walking in from the hallway.
Peeking at the double vanity to the left.
Here is a look at the double vanity with the subway tile, restoration hardware lights, floating vanity and vessel sinks.
Turning around 180 degrees, is the separate room with the toilet and tub. We ran slate tile up the front of the tub, and used slate inside the niches. We used a different shower curtain from the one in the design board as the pattern just didn't work in the space.
Even the toilet looks good, and so far I'm pretty impressed with it's performance. :-)
This weekend was full of 12 hour days caulking (thanks Momnipotent!), painting (the color is Behr Breaker), installing vanity lights, sealing grout, mounting fixtures and tons of other miscellaneous stuff. But it's all worth it. We stand in the bathroom now and are still surprised that this is our house. But it is, even if we have to pinch ourselves every so often to remind us we aren't dreaming.
Posted by
Corey
at
10:54 PM
30
comments
Labels: Baltimore, houseblogs, renovation, rowhouse, upstairs bathroom
Wednesday, November 5, 2008
Dog Shower?
Posted by
Corey
at
9:41 PM
4
comments
Labels: Baltimore, master bedroom, rowhouse, upstairs bathroom, wally
Upstairs Bathroom Layout
Looking back, I don't think I ever fully walked through the design process involved with the upstairs bathroom. It is a large space, roughly 6' by 14', but was awkwardly laid out. In the update I've tried to use the space better, seeing as this is the only full bathroom in the house. I'll walk through this process a bit to help lay out the changes.
Creating Two Rooms. In today's mode of thinking people are opening spaces up to create the illusion of space. In this bathroom, I felt it was too big and awkwardly put together and making two smaller spaces would suit the room better. Also, since the home has only one full bathroom I thought it would be better to separate the shower/toilet area from the vanity area for privacy, and allow one person get ready in the room without steaming up the mirrors.
Another reason for creating the two rooms, and moving the door, was to create better flow through the area. Personally, I just think the space flows better now.
Creating two rooms does have me concerned about a couple of things; lighting, and making sure the spaces don't feel cramped. The shower area has a skylights as does the outside hall, but getting adequate light (especially natural) into the vanity area will be difficult. The bathroom is in the middle of the home, so choking off the natural light to the vanity area isn't ideal, but in the future I'd like to replace the door between the vanity/shower area with a frosted glass door to allow more light in the vanity area. Also, I am thinking of adding two small recessed lights in the vanity area to supplement the lights mounted over the vanity. To alleviate the issue of being cramped I am using floating furniture. The vanity and the make-up station will both be floating. Hopefully this will work to help the space feel more open and airy.
Adding a pocket door. While it wasn't my first choice to use a pocket door for the bathroom, there wasn't a good place for the door to swing. The pocket door addresses this issue, and there is still a full door into the bathroom to allow a more secure entrance to this area.
Adding a double vanity. With the Queen moving in we knew we wanted more space for us to both get ready, and there is plenty of space for the double vanity. It was pretty much a no-brainer decision to add it. Also, by sticking to the original plumbing locations (tub/toilet/vanity) the only new plumbing modifications needed in the room were for the new tub and for the second sink. No major changes in shifting drain lines around, which was a relief.
Adding a make-up station. Not sure if this is the correct name for it, but it's what I call the area. I thought it would be good to have an area for the Queen to get ready, and by using the second sink and this make-up area she has her own area of the bathroom, while also staying out of the traffic lane into the shower area. This make-up area will be a floating drawer with a thin glass top, and an outlet has been added at an appropriate height for a hair dryer or make up light.
Adding a linen closet. The odd shape in the corner where the linen closet is was previously unusable space, so we figured we may as well make use of it. An 18" helped us not to intrude on the other door's swing, and also kept the closet from being to obtrusive in the spaece. The closet will be a great place to store towels and bathroom clutter, while not taking up usable space.
Adding shower niches. The two shower niches will be a nice place to store all the products in the shower. The Queen has a plethora of stuff in the tub area, so the niches will be a great way to avoid clutter on the edge of the tub.
Overall I'm pleased with the design. I think splitting the space into two rooms will functionally maximize the space, making it the best use of space for our single full bath house. I'll be glad to have the bathroom done in a couple of weeks.
P.S. Based upon comments from the last post I decided to go with the dual flush Toto Aquia. Hopefully it lives up to expecations. :-)
Posted by
Corey
at
11:40 AM
10
comments
Labels: Baltimore, design, rowhouse, upstairs bathroom
Monday, November 3, 2008
Oh Crap
Why does every home improvement project result in bouts of excessive research? Must be a side effect of being an engineer. Today's dilemma is the toilet, and after reading many reviews all over the internet I am a bit overwhelmed.
Some background... For the downstairs toilet I wanted a toilet that was a bright white, had an elongated bowl, and had a minimum of depth from the wall since the space was small. Simple enough. Now that it's in, I'm not all too thrilled with it's performance. You see, it has a tendency to clog. Not pleasant. I guess the Queen just puts too much down it's lil ol' gullet. :-)
For the upstairs bathroom I am being a bit more picky. I want bright white, modern looking, elongated, preferably a taller height, would be nice to have a dual flush, hopefully stays clean long, and I want performance, performance and more performance. This thing should be rush excrement down the drain at the speed of a bullet train. And I want it cheap. I must be asking too much, because the ones with the specs I'm looking for are running $400-500 including shipping. For a toilet. After skimming through reviews there is universal praise for Toto toilets, so I'm leaning toward this brand.
Meet the Toto Ultramax (MS854114SG).
Pros:
Cons:
Meet the Toto Drake (CST744SG).
Pros:
Cons:
Meet the Toto Aquia (CST414M).
Pros:
Cons:
Now how was this post for exciting? On a scale from 1-10 I'd say it's an 11. Anybody have any recommendations or thoughts? What are the most important issues on a toilet for you? Maybe I'll look at other brands other than Toto, seeing as this seems like a lot of cash for a crapper.
Posted by
Corey
at
9:03 PM
9
comments
Labels: Baltimore, design, rowhouse, upstairs bathroom
Tuesday, October 21, 2008
Butterflies in my Stomach
Tomorrow the contractor begins work on the bathroom, and I've got a feeling like the first day before school. You know, that gitty expectant feeling full of hope and without a thought about the challenges ahead. That kind of feeling. We'll see how I feel about this whole experience at the end of the job, but it will be good to have a finished bathroom in a couple of weeks.
I'll be working with the contractor tomorrow to jack up the roof where one of the main joists was cut through, sistering this joist, getting all of the building materials, and maybe we'll even get to the framing and laying subfloor. Speaking of the subfloor, I was hoping to just lay another layer of subfloor over the existing 5/8" floor, but there is a lot of movement in this floor. I'm thinking about removing the current subfloor and sistering the joists before laying new subfloor. I don't want to put slate down only to have the tile crack as this would be entirely uncool.
And now time for a dirty little secret... We made a big deal about which tile we were going to use in the upstairs bathroom shower floor, and the Queen even emailed Apartment Therapy and we got a shoutout on their site. After all of the waffling we decided to go with a tub. Yeah, we're that anti-climactic. There is only one full bathroom in the house, and while we like a standing shower, we thought about resale and the extra costs associated with the fully tiled shower. It sucks being practical and maybe one day we'll regret it, but the Kohler Archer tub is on order so there's no looking back now. I do think it's looks like a pretty snazzy tub though, and with a 20% off Home Depot coupon it was a good deal.
I bought the tub without a apron to it it, as I plan to use the gray subway tile on the front edge of the tub. I think the tub will still look good, and not doing the shower allowed us to add a linen closet, separate the bathroom into two rooms, and add a couple of niches in the tub area all for the original installation price.
Posted by
Corey
at
3:42 PM
6
comments
Labels: Apartment Therapy, Baltimore, design, rowhouse, upstairs bathroom
Monday, October 20, 2008
Most productive weekend evar!
How did we go from this?
To this, in a weekend?
A lot of hard work by the Queen and her bro is what got it done.
The Queen and I had a three day weekend so we worked hard to get the drywall issues fixed. The drywall is laid over plaster. It was not attached to the plaster or the joists well and the mudding job was extremely poor. This took a lot of fixing to make things look ok. Sunday the Queen's bro came over to help us paint the place. It was a long day that ended at 10 pm, with the closets fully installed and the painting done.
Next up in the bedroom is some drywall fixing, laying subfloor and the teak. Things like doors and trim are luxuries we may not have time for in the near future, seeing as the contractor starts work on the bathroom this week. For part of the bathroom work I'll be working with the contractor, so we haven't completely let go of our DIY roots, but with a single full bathroom we need to work quickly to get a shower back online quickly.
Posted by
Corey
at
10:27 AM
3
comments
Labels: Baltimore, closet, houseblogs, master bedroom, rowhouse, upstairs bathroom
Wednesday, October 8, 2008
Bathroom Floor Tile Decision
After meeting with umpteen contractors for the bathroom we think we're about ready to select one. We have most of the materials so we asked them to bid the job as labor only. Once we give the ok, the contractor would start in two weeks. So two weeks until start, and while we told him we have all the materials, we weren't exactly correct...
The original plan was to just refinish the tub. After looking at the condition of the tub and thinking about what we wanted weare going with a 60"x30" tiled shower instead. I had purchased the vermont slate for the bathroom floor, but since we were going to re-use the tub I didn't purchase enough for the shower floor. Oops. We'd heard that slate isn't great in showers anyway, so now we are on the hunt for tile that will look good on the shower floor that will go with our other tile.
12" x 12" Vermont Slate purchased the floors
3" x 6" Daltile Ice Grey tiles purchased for the shower walls and vanity backsplash
We are at a loss of which of the below will look best on the shower floor, so we'd love to hear your opinions on what you think would look best.
1. Marble Hex - After drooling at Anna's bathroom on Door Sixteen marble hex tile caught my eye. While I like it on it's own, I'm not sure how well it will go with the slate. Also, it is a bit of an odd transition the size of the hex to the slate, and the colors going from so dark to so light.
2. Pebble Stones - I think the pebbles could mix in well with the slate, but I am worried that it could look a little bit cheesy. Also, it will feel a bit odd on your feet. What do you think?
3. Black tile - I am thinking some 2"x2" porcelain or 2"x1" black marble tile to match in well with the slate, and continue the sleek black floor look through the shower. While I really like the black, the Queen isn't sold. So am I crazy in thinking this will match, or is the Queen right? Also, I think a couple of black tiled niches in the shower could look good.
2"x2" Black Marble
1"x2" Black Marble
What do you think will work best? Any ideas on things that would look better?
Posted by
Corey
at
9:07 AM
23
comments
Labels: Baltimore, design, rowhouse, tile, upstairs bathroom
Thursday, June 12, 2008
Bathroom Design Board
For the upstairs bathroom we have settled on the floor tile, wall tile, vanity, bath fixture, shower curtain, and vanity lights. The other furniture is notional, though we are keeping with the spa-like theme so far.
So far, the budget is pretty low and I think the look is good. We discussed how much of the vanity wall to tile, and I think we are going with the middle option below. We think this option will create the look we're going for without tiling all the walls around my huge bathroom (6'x14'). That would be too much labor, and a bit too retro.
Since the vanity doesn't arrive until mid-July, there is a while before the bathroom is done. Stay tuned as I stumble through tile work!
- ++
Posted by
Corey
at
8:05 AM
23
comments
Labels: Baltimore, design, houseblogs, lighting, rowhouse, subway tile, tile, upstairs bathroom
Tuesday, May 27, 2008
State of the Bathroom
Been a while since I've mentioned the bathroom, eh? Well the "improvements" have begun. Here is a preview.
Notice the lovely framing on the wet wall. I think a team of monkeys with hammers could have done a better job. This means that I will have to rip out this wall, which is shared with my closet. Boo for having to move my threads!
During the demo we had a fun time that included throwing a sink out of a second story window as well as breaking the waterline heading to the toilet, resulting in water gushing through the pendant lights in the kitchen. Fun times.
- + + +
For bathroom vanities I found a couple I like better than ikea, and they are a good deal. I like Exhibit A & B, but they won't be available until mid-July. :-( That leaves exhibit C, which is looking swanky is available now and is similar in price to an ikea set-up. All sets include the vanity, mirror, shelves, countertops, sinks and even the faucets.
Exhibit A:
Exhibit B:
Exhibit C:
Posted by
Corey
at
10:03 AM
14
comments
Labels: Baltimore, design, houseblogs, rowhouse, upstairs bathroom
Monday, March 10, 2008
A Wise Investment
Renovating a home means constant runs to your local home improvement store. I probably go to the local HD three times a week for miscellaneous supplies. All this adds up. To a lot. Occasionally I get coupons from Lowes, or I hear of HD coupons for 10% off. Also a heads up that HD and Lowes honors their competitors' coupons, so if you find a good deal at one big box store you can use it at the local store you prefer. Sometimes you get these as part of a package when you change your address or just randomly in the mail. Seeing as HD is my second home, a coupon every few months while useful, doesn't help me as much as it could. Enter Ebay.
Ebay has many folks selling 10% off coupons on the site. The price is generally around $3.00 per 10% off coupon, and you can buy them in lots ranging from 1-25 of them. For $25, including shipping, I got 8 of them. Spending $25, has saved me about $100 so far and I still have half of my coupons left. Not a bad deal at all.
Motivation was majorly lacking this last week, so progress on the home front was light. While I had a three day weekend I got remarkably little done in the past week. I ran new electrical and conduit in the built-in area for all the electro-geekery, hung the LCD mount in the kitchen, butchered a cabinet doorhung the last of the kitchen hardware, changed out the dining room light, picked up all the backerboard for upstairs and some downstairs tile work, ordered slate tile for the upstairs bathroom, laid the backerboard over the fireplace tile and foyer floor, did some more drywall mudding and sanding, finally got the trash hauled out of the back yard, and ripped out 2/3 of the linoleum floor in the upstairs bathroom.
This week I should finally finish trouble shooting the foyer electrical (need a second set of hands), lay new tile over the fireplace, finish framing for the TV over the fireplace, get all the drywall and greenboard delivered, install the drywall on the built-ins and fireplace, drywall the knee wall, and hopefully start really finish out the foyer floor, drywall and trim.
Posted by
Corey
at
11:44 AM
11
comments
Labels: Baltimore, bookshelves, living room, renovation, upstairs bathroom
Tuesday, February 12, 2008
Craigslist Rules
Guess who gets to spend a 6 hour roundtrip drive on Valentine's day to NJ for tile? This guy! I normally wouldn't be so excited, but the opportunity to save over a $1000 gets me all fired up. It's debatable that the bathroom could look better with a more colorful tile, but being able to do all my wall tile, including around the vanity, shower & maybe the walls for $350 (the guy lowered the price) is a pretty sweet deal.
I'll probably just spend this money to upgrade something else, but this will just make the space look that much better.
P.S. Good thing Leigh is away for work on V-Day, or I think she would kill me.
Posted by
Corey
at
6:12 PM
5
comments
Labels: Baltimore, craigslist, renovation, rowhouse, subway tile, tile, upstairs bathroom
Gray Subway Tile & Design Software
It looks as if I may jump the gun and get the 3x6" gray subway tiles. After looking online for subway tiles I found prices to be at least around $8 a sq ft, and that is before shipping. Leigh looked on craigslist and found someone selling 20 boxes of 3x6" tile for $1.80 a sq ft. Here are some specs,
Sold: 1 Box
Pieces Per: 100 Piece
Avg. Waste Factor: 10
Shipping Weight: 36 lbs.
Coverage: 12.5 S/FT
Length: 6 Inch
Width: 3 Inch
Thickness: 0.313 Inch
Color Family: Gray
Shade: Medium
Surface Type: High Gloss
Design: Rectangle
Composition: Ceramic
Edges: Straight
Wear Rating: N/A
Installation: Thin-Set
Usage: Commercial; Residential
Seeing as this could save me oodles of money (while costing me a drive to NJ) I think it may be worth it. The use of gray will definitely require some accents for color, but the price is right.
- +++
I also downloaded Google SketchUp and Ikea's Kitchen Planner.
I measured the upstairs bathroom last night, made a model of the room in SketchUp and started playing with some designs. The program takes some getting used to, but it's not too terribly different from AutoCAD so I'm fumbling my way through it. Once I import some cabinet designs from their library I can really start to model the room right. For now, I am just using 3D blocks to represent the major items (cabinets, shower & toilet).
I wanted to use the Ikea bathroom planner, except for the minor glitch that it doesn't exist. The kitchen planner will work, and I think I may just go with kitchen cabinets in the bathroom since they have a higher counter height. I wish I could see how Ikea's Hollviken sink would look in the space.
Some things I am considering in the design are single vanities, double vanities, various closet organizers, as well as breaking the bathroom into two rooms to seperate the sink from the shower/toilet room. I'll upload pictures of design ideas as they become available.
Posted by
Corey
at
11:25 AM
1 comments
Labels: design, ikea, software, subway tile, tile, upstairs bathroom
Saturday, February 9, 2008
Upstairs Bathroom Design Inspiration
Now that things are coming to closure downstairs, it's time to start planning out the upstairs renovation. While much of the work upstairs is patching drywall, laying flooring and updating trim, the major design decision is the bathroom.
I was going to rip out my 6x14' bathroom, remove (and relocate) an adjacent walk-in closet, and put in two bathrooms in the now 6x17 space. Plenty of room for two bathrooms. This was the plan before I saw cottage house, so now I am pretty well sold on keeping just the one bathroom upstairs to minimize the renovation time. It will still be a nice big bathroom and will make the renovation much easier due to not re-doing plumbing, electrical or re-framing.
I'll be keeping with the modern, but not too modern, theme of downstairs. I am a big fan of subway tile, and am digging light gray; it has a coolness without being cold.
I was thinking the subway tile would go in the shower as well as above the vanity. I'd also like to work in some glass tile, but I'm not sure I want to compete with the cool, smooth lines of the subway tile. I'll have to shop around for some decent deals on this stuff, as I'm really trying to minimize costs on the bathroom redo. I'd like to continue the tile around the lower portion of the room, but it's a big room, so not sure I want to be tiling for a month.
The subway tile coupled with a hex tile on the floor could look good? I am still looking at other floor options as I'm not completely sold on the hex. Also keeping with the cost cutting, I'll most likely be be getting the vanity, sinks & lighting from Ikea. I think it could match pretty well, and could get me a new bathroom at a great price.
Posted by
Corey
at
8:05 AM
23
comments
Labels: Baltimore, design, houseblogs, renovation, rowhouse, subway tile, tile, upstairs bathroom