Showing posts with label basement. Show all posts
Showing posts with label basement. Show all posts

Sunday, February 3, 2013

Man Cave

At the old house, I never really got to enjoy the basement after it was renovated. That was a bit disappointing, but the new house came with a great finished basement. The space had a built-in to the side of the room for media components, and some wiring for surround sound. While wire was run, it was just hanging out of the wall in a bundle at the back of the built-in (sorry, no before pics) and cables were not run to the wall where the TV would hang. Please note my foam Michigan Wolverine foam head at the bottom of the cabinet.

IMG_7220.jpg

Soon after moving in work began to finish the space. I cut a gaggle of holes into the drywall and ran 2 HDMI cables, 1 set of RCA cables, and an optical cable from the built-in to the TV. I picked up a new tv and a slim TV mount because I didn't want my TV sticking out too much, and some wall plates for all the speaker wires. I got all the cables from monoprice and after reading reviews I decided to the speakers there too. I got some front speakers, center speakers, rear mount speakers for the ceiling and a small sub. I really liked the look of everything built in and not needing a media cabinet in front of the TV.

IMG_7182.jpg

Since we loved our previously purchased Crate & Barrel Axis sectional we decided to also go with C&B for downstairs. We went with the Vaughan. While not as comfortable as the Axis, it was a much smaller sectional that fit in the 12'x 12' space and still allowed room for a chair. We threw some beer themed pictures up on the wall to complete the man cave aesthetic and now the space is complete.

IMG_7223.jpg

On the back wall are closets that run the width of the house, and the sump pump in the right-most closet. The chairs are on this side to make sure we can still access the space. We also got a white ceramic deer head as a Christmas white elephant gift, so we decided to hang it above the TV. Gotta keep it classy.

IMG_7180.jpg

Thursday, August 4, 2011

Basement Complete

At last glance, the basement was framed and electrical rough in complete. Not pretty, but well along. At this point, I can proudly say the space is complete. We brought in a contractor to hang and finish the drywall as well as hang and trim the doors. At the time, I was unsure of using contractors, but in the end I'm glad we did this. The price was reasonable and in the tight timeline of getting the place rented out we needed this done quickly.

The contractors finished up on Thursday. Friday through Sunday we had a lot of help from the Bro in Law (BIL) and Sister in Law (SIL). By the time the dust settled and the carpet was installed, we went from a space with drywall and doors hung to this.


IMG_2767

We are still amazed of the transformations. The ceiling height is only around 6'6" but thankfully it doesn't feel too short. I wish it were taller but it wasn't worth the extra money of digging it out. We painted it the same color as the master bedroom, and are glad we did so. We painted the area underneath the return duct semi-gloss white for contrast and to the right you can see how the window and bench turned out.

Looking back from the front of the house toward the stairs is the door to the utility closet to the left, the door to the unfinished area in the middle, and to the right the stairs up to the first floor.

IMG_2765

Thus far our only regret is that we didn't do it sooner. With buying the new place we won't ever have a chance to truly enjoy this basement. Hopefully our renter enjoys it, and looking back, it is quite an improvement.

IMG_2767

Sunday, July 24, 2011

Basement Framing & Electrical Rough-In Complete

Now that we are under contract on the new place, the basement renovation kicks into high gear. Much like in December of 2008 when we decided to refinance our mortgage and creating a deadline to finish renovations, we are now in a similar position. We want our house occupied by a renter on 9/1. Yowza. With a basement under construction, a new house upcoming, a trip to Irelend, and finding out what the hell we need to do to rent the place the next month will be crazy. Time to kick things in gear...

In keeping with this, we are bringing in some help on the drywall. We got a bunch of quotes that were surprisingly reasonable. We ended up picking a mid-cost quote of a guy that I trusted. We then got him to throw in a bunch of extra work like hanging all the door jambs and doors and fixing a three switch that had gotten the best of me. An aside, when picking contractors, I usually go with my gut. This is never the high cost bidder, but usually someone at the mid to low end that will end up working with me a bit. This sometimes means quality is 90% instead of 100% but the lower costs have been things that I've been able to help fix.

Here is where we stand. Coming down the stairs, all the paneling, plaster and lathe, and most importantly the stairs were ripped out and recessed lights on a 3 way switch were put in. It looks great now.


Basement Reno - Framing & Electrical Rough-In

During the renovation it didn't look as good. I was hoping to keep the stairs as is, but after looking at them in detail they needed to be replaced. They literally bounced when you walked on them and were held up by about 6 nails total. Scary. Luckily, my amazing father agreed flew in from Detroit to help frame the basement and (little did he know at the time) replace the stairs. This basement would not be done if not for him. As you can see, the stairs were scary.

basement stairs

Walking to the bottom of the stairs and looking out things look much different than before. Before, it was a pile of crap.

dirty basement with captions

The view looks much better now. All the recessed lights are in, the plumbing lines and electrical to the second floor have all been rerouted to increase the headroom, and insulation is in place to help isolate the sound from the first floor living room.

Basement Reno - Framing & Electrical Rough-In

A look back at the stairs and portion of the remaining basement that will remain shows the recessed lights back in that area. I put the lights on a motion sensing/IR switch so when you walk in the space with your arms full of laundry you don't need to find a switch. We were talking about making a bar or closet in the area to the left but now that we are going to rent the space, this isn't a priority.

Basement Reno - Framing & Electrical Rough-In

To the right of the stairs is the framing around the HVAC. I added a small step at the bottom of the stairs to steer you toward the center of the room and away from the framing around the HVAC return. I was going to put a custom wine rack in this area, but again, this isn't a priority at this point. I added electricals circuit here in case I want to get fancy in the future with lighting the wine or potenially add a small bar over here.

Basement Reno - Framing & Electrical Rough-In

Walking a few steps forward, you can see more of what the living space will look like. A small closet is on the left, and I made a bench underneath the window to fill this dead space. On the right, there is a storage area that is accessed through the utility room door. Originally I was going to just do a soffit in this area, but the HVAC and water heater exhaust would still have been too low to make this area usable so I just closed this space in. The soffit change resulted swapping the seating area to the left instead of the right, but it shouldn't be that big of an issue.

Basement Reno - Framing & Electrical Rough-In

Looking back toward the stairs you can see this utility room. This room required moving the water heater to allow one door to be able to service the equipment while allowing space into the closet space to the left.

Basement Reno - Framing & Electrical Rough-In

While overall I don't like using contractors, it is nice to know that by the end of this week the drywall will be in and mudded and all doors hung. As I type, guys are loading drywall into the house. Hopefuly it will be hung with a first coat of mud in place by the end of today. :-)

Tuesday, July 19, 2011

Updated Mechanicals

After looking at the blog, I noticed a draft I never completed. So I finished it. :-)

Looking back to '08, I was considering a new HVAC system. Our system was old, energy usage was up, and the system wasn't keeping up with the heat and cold. I should have redone the system then. But I didn't. And it continued to get worse.

Last October the furnace went down, and since we were in a better financial position than we were in '08 we decided to update the system. Since we had issues with both the furnace and the A/C it was time to update both. I got quotes, and ended up going with a SEER 16 2.5 ton unit outside, and a 80% efficient gas furnace inside. All said and done the costs came in at $5100. We then got $600 in rebates from Rheem, $500 from the State of Maryland and an additional $350 from BGE. With the combination of the SEER 16 outdoor unit and 80% efficient indoor unit, we were also eligible for $1500 in tax credits. What originally was a ludicrous cost became a manageable cost, especially since replacing the equipment late in the year minimized the time between our payment and subsequent tax return. Also, by negotiating our deal in late fall the HVAC companies were looking for work which allowed us room to negotiate.

While the up front costs were high, overall it was a good decision that I wish we would have done sooner. I don't know if we will ever get the money back for this, but doing this change two years later than we should have cost us a lot in extra energy bills. If I had to do it all over again I would have done it sooner.

Also, as we were looking at the HVAC upgrades we realized our ducts were undersized. Especially our return ducts upstairs. We decided not to undertake this task yet, as we wanted to see how much just changing out the units helped. While it has definitely lowered our costs, at times I can tell we need more air changeover upstairs. In the long run I think this task is something that should be done, but for the next few years it is definitely on the back burner.

Monday, March 28, 2011

Pit of Despair Design

Now that you've seen the pit in all of its unfinished glory, here are some explanations of the space.

dirty basement with captions

Pay special attention to my return duct in the way of the stairs and the pile of crap on the floor. Also notice the plumbing and electrical conduit lines underneath the joints through the middle of the space. It will be lovely rerouting this. I greatly look forward to this endeavor... Also, as we go forward please be patient with my adjustment of the space to make sure it corrects for my screwing up the initial measurements accurately represents what is really there. For instance, in the following picture I screwed up the return vent width at the foot of the stairs showing it as 24" long when it is really 61" long. Oops.

basement1

Here you can see the overall space and the new doors to the gas meter (it says "water meter", but I screwed up), the door to the water heater (I actually got this right). To the right side of this door is the furnace. On the right side is the new door back to the unfinished portion of the basement. Planning around the many obstacles is creating dead areas, and the fun part is figuring out ways to minimize these areas to maximize usable floor space. For instance, to use the space to the left of the stairs underneath the return vent that juts 24" below the joist I've thought about adding a bar counter high enough to add some glasses and a mini fridge.

basement4

I'm not sure what else I can do with this low space, other than adding a wine rack or something of the like. Also take a peek to the left to see where I put the couch, which is a way to use the 5'-6" height underneath the supply vent without eating into the space. I put it on this side of the house as I want a chaise or an L shaped couch and the new closet for the water gas meter means I can't put an L/chaise here. If I put the couch in space shown, it uses the dead space forward of the gas meter as a place to put the TV on the opposite wall. This is shown in the next picture where I was too lazy to create actual built in shelves in sketchup and instead just show an orange call out where I'd put the shelves. Hopefully you all have excellent imaginations.

basement5

The custom built-ins would create extra work for me and while I probably wouldn't get them 100% right it would allow me some good practice. The bad news about this is it would pretty much take up this whole wall. With the door to the gas meter where it is I'm not sure what else I could really put in this area though. In this view I also added a notional space for a closet in the dead space between the stairs and the unfinished portion of the basement. This could serve as a good space to hang winter/summer clothes during the off season, and since the space is so narrow I'm not sure what else I could use it for... One layout I'm considering for resale purporses is to create a space separate from the stairs that I can market as a bedroom in the future.

basement6

Making a wall here creates a deadspace at the bottom of the landing. While I can fill part of this space with a closet, it really chops up the space. That said, a chopped up space that creates an extra bedroom in a two bedroom house is something that deserves consideration.

Well, now that you've seen the space what are your thoughts? It would be nice to hear some opinions on how you would configure the space. I'm not sold on any specific design and am curious to hear peoples' opionions. Please help! :-)

Sunday, March 27, 2011

Basement Beginnings

Instead of spending the last couple of years renovating, I've been off getting married, getting fat, and doing many things other than renovating. But now it's time to get back to work. In the past few months the Queen and I have been busy finishing up the crown molding upstairs, redoing the bedroom in a Restoration Hardware style, and have started to finish the basement. The first two items will be covered in later posts, but for this post I'll focus on the basement. Or from now on, I'll call it the pit of despair, or just the pit. The pit has been so horrendously scary for the past couple of years we've been afraid to do anything with it. Check it out...

dirty basement

Scary, eh? And this is after I spent a long time cleaning it and selling a ton of crap on craigslist. After making it so I can actually see the floor I have motivation to now cover it with plushy carpet and make it my mancave a non-gender specific den. I have so much motivation that I told my father about it and ask him to come in from Michigan in a few weeks to help renovate it. Oh yeah, it's on like Donkey Kong...

In normal spaces renovation is pretty straight forward as there are usually flat floors and ceiling free of obstructions, and you are usually nailing into all wooden surfaces. Not in a basement. My basement has a crusty old uneven floor, the height is about 6 and a 1/2 feet to the joist, and the edges of the rooms are an obstacle course of ducts, plumbing and other goodies. To get ready for this I've started drilling holes through the joist to re-route the electrical and plumbing, and to draw the place up using Google sketch-up. It is going to be a framing nightmare, but once I figure out the floor plan I'm hoping I can do up the place pretty nice.

Since I bought the house in 2006 and did a quality renovation, there is zero chance I will get back all the money I put into it. I've come to accept this. That said, the basement renovation plan is to make a space that is usable as a second entertaining space for a very low budget. I'm hoping to to it for under $4,000. This means there will be sacrifices.

    1. We aren't digging out the basement. With a ceiling height of about 6 and a 1/2 feet, there isn't much height. To dig out the basement would cost on the order of $30'ish bucks a square foot. There is no way I'll make this money back. To make the space not feel claustraphobic I'll be using recessed lights and trying to keep as much headroom as possible.
    2. While we only half 1 and 1/2 baths, we aren't putting in a new bathroom in the basement. This would require smashing through the floor, and then without raising the ceiling height we probably couldn't put in a shower. While it would be great to have another bathroom I just don't think it's worth the expense.
    3. The floor is old uneven cement, and it's going to stay that way. My plan is to carpet over the old concrete. To rip out the concrete, or to attempt leveling it would be some big bucks.
    4. I will only finish the front 20 to 25 feet of the basement. The total basement depth is 45 feet. The back area house a nice storage area and the laundry area. While it would be nice to have a finished laundry area, it just isn't worth the money. Also, I really like having some unfinished space in the basement for storage.
    5. I will try to work with my existing HVAC, water heater, and water meter locations. To move my main mechanicals will cost me thousands, and while the constrain the space more than I'd like, I think if I optimized thing I'd only gain a few extra square feet of useful area. My plan is to be creative using lots of storage in hidden/unusable corners and crannies.

Next post I'll talk a bit more about the design and some of the design trades I'm thinking about such as whether to make this a future bedroom with it's own door, adding a closet vs. a mini bar area, and building a custom entertainment center with built-in book shelves.

Thursday, January 8, 2009

Basement Update

I came home from work early to deal with B-dry and our basement water issue. When they came in I pointed to their newly done area, only for them to point out my sump pump wasn't working. It had come unplugged. I felt like a complete dolt whe they pointed at the home's deficiency, but was pleased when they volunteered to wire an extra outlet to make sure the sump didn't come unplugged for no charge. I'm a pro at wiring outlets, but I appreciated their willingness to please when they had no obligation to do so.

On a separate note, the Queen and I have been working like dogs from the time we get home until at least 10 each night. Things have been busy, but at least we're making progress. :-)

Wednesday, January 7, 2009

When it Rains, It Pours

Remember when B-dry came out to fix the foundation because we had standing water in the basement? I do. I went in the basement this morning to find standing water which appeared to be coming from the newly repaired area.

*sigh*

One more thing to deal with. Joy.

Tuesday, January 6, 2009

Planning Ahead

On Black Friday we braved the crowds and headed to Sears to pick out a new washer and dryer. The current dryer has been screeching like a howler monkey for months, and the washer has a constant pool of water in the pan below the unit. Not good. We got a great deal on an energy efficent front load washer and gas dryer, picking up the pair for $675 delivered, and the old units removed. Unfortunately the units were on back order until mid to late February. This wouldn't be a problem if our dryer stopped working last weekend... DOH!

My mother, the Queen's mom, and the Queen went to Sears to see what they could do to remedy our situation. They were able to somehow get us an upgraded washer and dryer, arriving next weekend. Regular price of this combo is $1490, and we're getting it for $675. In the words of Borat, "VERY NICE!"

As an aside, I'm always thinking about the future and how to upgrade the house to minimize overall costs. For instance, we are getting a gas dryer even though our current dryer is electric. Here is the history and reasoning that lead to this decision...

1. During the kitchen renovation, I noticed the electric dryer wasn't exhausting outside. I had the contractor add a vent, but knew the current placement of the dryer left it too far to actually hook the vent up. I want to finish the front of the basement, which means eventually moving the dryer toward the back of the house and since the wall was open at the location of the vent figured it was as good a time as any to add this. While a vent is a good idea to minimize moisture in basements, it isn't required for an electric dryer. I figured I'd add the vent for the future, and I'm glad I did as a gas dryer requires a vent because of the carbon monoxide gas exhaust.

2. When wiring the upstairs bathroom two dedicated circuits were added to bring it up to code. Previously, the bathroom didn't have any dedicated circuits. With adding two circuits my 100 amp breaker was now full. Since I want to eventually finish the basement, and I don't want to upgrade to a 200A service unless I have to, I needed to find a way to eliminate a circuit or two. With the replacement of the dryer looming, I figured that by switching to a gas dryer I'd be able to run a gas dryer off the same circuit as the washing machine. This would allow the elimination of the two circuits dedicated to the 220 VAC circuit for the electric dryer. This results in no panel upgrade required. Panel upgrades aren't cheap, so I think this is a good idea.

3. We need to add a gas line to the dryer. This shouldn't be a big deal, but with wanting to eventually finish the front of the basement the current gas line runs below the basement joists through the middle of the space. We could just add a gas line for the dryer off this old line, but we'd eventually have to rip it all out when we renovate the basement. Instead we are opting to have the gas line routed to the side of the space. This results in higher near term costs, but results in zero re-work in the future. Luckily I know a $30/hour plumber, so the costs for this are manageable.

The moral of the story is that we're getting a new washer and dryer, that will result in near term costs for gas line upgrades, but will save us money in the long run due to high efficiency and not requiring us to upgrade the electrical panel later. Sure it may cost more now, but the costs are worth it in the long run.

Monday, December 1, 2008

Our Response to the Economic Downturn

In response to my post last week about how the economic downturn has affected you, here is how the economy has affected us.

1. We have a 100% financed house on an interest only loan. On the surface, this makes us a pretty high risk, at least from the current lender's perspective. I either had money for a down payment or for renovations. I chose to save on the down payment and monthly payments and put the money into renovations instead. A lot of people did this. I knew the housing market was souring, but I didn’t plan on making money on the house. I've only planned on learning how to renovate a home and hopefully be able to get out what I've put into it. Thus far, the money used for renovations has come from our bank accounts without the use of any loans. The debt we are currently carrying is some credit card debt, but no loans from other sources.

2. I had enough money for the kitchen renovation, but was planning on refinancing after this was complete and pulling out equity in order to fund the rest of the renovations. The economy fallout had begun, so I am not sure I would have been able to pull out the amount of money I needed. While I had put a lot of money into the house, refinancing has a lot of fees associated with it and the banks were no longer offering 100% financing. While I had effectively put a 20% down payment back into the house with the kitchen and downstairs bathroom renovation, the banks were moving toward 90% loan to value ratios and with refi fees I feared I wouldn't get back enough money to complete the renovation. I decided to finish the upstairs and refinance when the house was mostly done. The timeframe I made this decision was about the time the blog began, early this year. I am not sure this was the best decision to proceed on without refinancing, and it has caused a considerable amount of stress on us, but it's the path we have chosen.

3. The houses on both sides of me are both in trouble. One is in foreclosure, and the other one was in foreclosure (though I am not sure what state it is now). They are both rehabbed, though both not done particularly well. I am not certain what effect this has on me yet. It can't be good. The renovations I have made vastly exceed the quality of work in these other houses, but I am acutely aware that I could be overbuilding for the market. I am hoping that by doing a lot of work ourselves we will get most of the money out that we've put into it, but since we've paid cash out of hand for renovations thus far we are already invested. This means if we do move, we may not make much money but at least we most likely won't need to come to the closing table with a large check in hand.

4. The Queen's name is not currently on the mortgage. I've been waiting to refinance to do this, but renovations always take longer than expected (especially for such a large project like ours). I can't refinance until the house is almost done, as we want to be SURE that we have at least 20% of the home value into the home to avoid PMI and looking like we are high risk lenders.

5. What brought home the credit crisis to me was when I applied for a loan for the foundation work in the basement. Since the Queen's name isn't on the mortgage, I had to be the one to take out the loan. The loan was only for $2k. I was shocked when I was denied. My credit score is good (greater than 750), but I suppose the credit card debt coupled with a 100% financed interest only ARM made me too much of a risk for the loan. Also, without her being on the mortgage, from a credit perspective they don't see her as officially contributing to the mortgage thereby making it look like I am really in a bind. We found the money for the foundation work, but we would have liked to have a bit more cash on hand to continue with other work.

6. We seriously consider what renovations will really provide a return on investment. This pattern of thought has led us to do much of the work ourselves. Another example of potential cost/scope cutting is for us to reconsider digging out the basement to increase the height. It currently is about 6.5' of height, below the minimum 7' height for a habitable space. While we'd like to dig it out, a preliminary estimate (which is probably high) quoted us $45 a square foot to dig the space out. We'd only like about half of the space dug out, but this would still cost around $13k just for the dig. Add framing, electrical and moving things like plumbing and gas lines and the price only goes up. Now we're looking at just making the basement into a nice space without digging out. While it may not be perfect, it could work for a man cave. Other places that we talked about to save money on is the backyard. While I'd love something I planned out previously, it may just be overbuilding.

Going forward money will always be on the mind. While we'd love to make the house perfect, there is a point where it just has to be good enough. Finding that happy medium is the difficult part. Hopefully the money issues will work out OK in the coming months, but we are still proceeding on to finish what we’ve started. We have accepted that we are taking on short term debt, but feel that we are most of the way there and need to finish the main and second floor completely from a livability and a refinance perspective.

The next post I write will have pictures. Lots of pictures, because looking at all these words is boring me to tears.

Wednesday, November 19, 2008

Taking a Jackhammer to the Basement Floor

Last week we had an issue in the basement. The water is gone, but we decided to get this issue fixed ASAP. Now that the bathroom is done, we can focus on the second bedroom. The issue with working on this bedroom is that it is filled with stuff. The logical place to put this stuff is in the basement, so this means making sure the basement is safe for storage. This is where B-Dry comes in.

They came and gave us a quote on Saturday, and while the costs were lower than what we were expecting, some things they were offering just didn't make sense. I wanted a Honda of a foundation job. Something not too expensive and reliable. Their original offer was for a Cadillac. For instance, they originally said they'd have to replace my 3 month old sump pump in order to guarantee their work. They kept calling back with better and better offers, and finally we settled on a price about 40% lower than their original quote. They'll be here next Wednesday. I'll be glad to have this issue over with, and to be honest I'll sleep better because of it.

After this is done all we have to worry about is finishing the second bedroom, laying the teak floors through the whole house, eventually finishing the basement, replacing the HVAC system, insulating the attic, and 10,000 other miscellaneous things. Good thing my parents are coming over Christmas to help out. If only they knew what they're getting themselves into. :-)

Gratuitous Wally shot!

_MG_1247

We are quite proud of our furbaby. He's in advanced obedience class, where we get to gush at how incredibly smart and well behaved he is. He'd be even better if he didn't eat remote controls, but I guess he can't be perfect.

Thursday, November 13, 2008

Questionable Foundations

You know it's not good when the contractor calls from your house to tell you that you have a 1/2" of water in the basement. The call didn't improve after he found a spot in the foundation where the water was entering. With the final bill coming due soon on the bathroom renovation, this is not a good time for this.

Does anybody local know of a good basement/foundation person? Any help would be appreciated, the sooner the better.

Monday, August 4, 2008

Ding Dong the Toilet's Gone

The Queen is all moved in. Renovations are nowhere near done. Boxes fill the second bedroom and furniture overflows the house. With things piling up I tackled the project of removing the throne in the basement. A toilet sat in the middle of the room with no walls around it. The plumbing wasn't built into the floor causing the toilet to hover over the rest of the space like a holy throne. While it was a lovely sight to behold, it took up valuable storage space. After 3-4 trips to the hardware store to get the correct plumbing supplies the toilet is gone and the plumbing is all capped off. I'll build some benches in the back and this will be an extra area for storage.

It is so difficult to live in a rowhouse while renovating it. The small space, coupled with an open floorplan mean keeping the place clean and tidy is near impossible. When more than two people are working, it's almost mandatory for people to be in at least two rooms. This means tools, building supplies, and messes are scattered through the house. Also, nobody tells you that when you are doing a DIY project the amount of stuff you have to buy. Not just tools. The house is filled with 3 different kids of drywall, 5 different plywoods/OSB, and a plethora of drywall, painting and miscellaneous building knick knacks. All necessary and all taking up precious space.

Tonight I am picking up even more building supplies - 15'ish sheets of plywood. Joy!

In all honesty, this post was just made to move the last post down the page and out of sight.

Wednesday, July 23, 2008

New HVAC system?

A few reasons have me considering an upgrade to my HVAC system.

    1) My latest BGE bill. I used a whopping 1578 KWh of electricity in June - almost 3 times as much as I used last year. My A/C unit is running almost constantly, even after I had a guy come out and look at it. This doesn't seem normal. I have some holes in the house due to renovation (like ones into the attic), but I was surprised to see costs up this high. Maybe the 50" plasma and XBox 360 are to blame too?

    2) Natural gas prices are up over 200% since January! (See the table of my energy costs below) Since this is the cooling season most people don't notice, but come winter this will lead to some hefty bills.

    I know something is wrong with my gas meter so I don't think it's recording my full usage. I don't have a problem with this, but BGE has volunteered to come out and fix this issue for me free of charge. I haven't been expeditious in getting back to them. I don't know how this would increase my cost/therm, but maybe this is the case? I doubt it though.

    3) My current A/C and furnace are at least 15-20 years old. I have a home warranty on my house, which has been used numerous times to repair my constantly ailing HVAC system. Each time the warranty company comes out they fix piece parts but it doesn't look like they'll buy me a whole new system. *sigh*

Baltimore Rowhouse Consumption Table*
energy


Energy prices are also motivation to seal up the cracks in the ceiling and to actually insulate the attic. Yes, I have no insulation up there as I've been waiting to redo the upstairs bathroom before blowing it in. I'm a bad person with a carbon footprint the size China.

My buddy Dru works for a big HVAC company, so he's running some numbers for me. My prelim estimates have me thinking I'll need about need about 2 tons of chilling capacity. Pricing out some mail order split systems (both interior and exterior parts) gives me a range of about $1500-2500, plus installation. The $1500 system is SEER 13, while SEER 16 would run about $2500. I'm not sure the extra $1000 up front is worth saving me around $120 a year. I'd like to be green, but I also don't like to throw a bunch of money away. Also throw on maybe $1000 for install (I have no clue) and this is looking to be a pricey endeavor.

After the sizing is run I'll take another look at what the prices are and decide if I really want to do this. While it wasn't in the plan to upgrade this, the costs are making more and more sense.

*Some notes on my calculations. The prices I used are prices for electricity with all taxes and fees added on, and the gas costs are the commodity prices plus the delivery charges. Comparing bills I've noticed some interesting things happening with prices.

    a) Surprisingly, the cost/KWh of electricity has stayed roughly the same. I had thought there would be a massive increase due to high commodities (coal). I wonder why prices have held steady. Any ideas?

    b) While I see the commodity cost of natural gas has gone up 40-50% percent, what I don't understand is why BGE is charging 40% more for the delivery charge. Not sure why this would correlate with commodity prices.