To make sure I hung the shelves right, and to help decide what size TV to get I made an AutoCAD sketch of the built-in area.
To compare, here is a shot of the area before the renovation.
The framing and drywall of the area is complete, with an electrical outlet added behind the TV space, and a wireway created to the entertainment unit. Also, speaker wire has been run behind the TV to allow speakers to go unobtrusively on the shelves. Thus far, there should be no way to see any wires.
The shelves will most likely (read, if they work) be a white Ikea Lack, modified to fit. I bought a couple shelves to play with; hopefully I can make them work, as I really like the frameless look and I can only use the framing wall behind the shelves for bracing as a couple of the side walls are not structurally sound. The max load per shelf is listed as 18-44 lbs, but I am decreasing the depth of them by about 20%, and trimming down the length 15-25%. This should increase the load capacity, especially since I'll be stiffening up the frame too.
The television will be a 46-50" TV, wall mounted on a tiltable mount. The lines on the drawing show both sizes, which I'm town between. While I'm all for a nice big TV after living with a 20" TV for the last 10 years, I don't want to get too big from a height perspective. While the width is nice, the couch sits across from the TV about 10' away, so going too high means you are looking up at it. The bigger the screen, the more you have to look up. Gotta love the limited design trade space due to having a small space.
For the electronics storage we purchased the Ikea Tobo. We needed something to fit the electronics and had a way for the IR signals of the remote to get into the cabinet. The 19" depth and glass front accomplish these goals. While I would have preferred a more mid-century modern wood piece, the width of this indented area really limited us. If something nicer comes along we'll get it, but this will work for now.
The tile area in front of the faux fireplace will be tiled over with white subway tile (yay for $1.50 sq/ft tile from HD), and the mantel painted white. The hardie-board is laid down and I'm waiting to borrow a tile saw to get this project done. The ceiling fan in the above picture is also no longer. The light would have shone onto the TV and the width it gone and can lights put in the 9' ceilings are definitely more noticeable.
Saturday, March 29, 2008
Built-In Bookshelves Drawing
Posted by
Corey
at
9:26 AM
7
comments
Labels: Baltimore, bookshelves, electronics, houseblogs, lighting, living room, recessed lighting, renovation, rowhouse
Monday, March 24, 2008
Scope Creep and the 5 Phases of Renovation
Phase 1 - I want everything. I want it now. Cost doesn't matter, so I'll pick the most expensive materials AND I'll have someone else do it.
Phase 2 - Phase 1 costs too much. I'll do it myself, schedule be damned.
Phase 3 - The cost is ok, but the orginal plans will take too long. Cut scope.
Phase 4 - I really want everything in Phase 1, schedule be damned.
Phase 5 - What have I gotten myself into. Time to re-examine Phase 1.
I am in Phase 4. After deciding long ago that built-ins and recessed lighting in the first floor wasn't required, both projects are well on their way to completion. I decided that with the LCD over the fireplace the ceiling fan wouldn't look right, and would have light shining right on the screen (see pictures from previous post showing fan), thus Saturday was spent cutting holes in my ceiling with a reciprocating saw. The taste of drywall, plaster, lathing, and 100 year old dust is fresh in my mouth. Normal people wouldn't inhale such a cocktail, but I am not quite normal.
Here is a primer on my safety plan at the house. Work safely, when convenient. Which is never (I exagerate a bit). This drives The Queen's parents crazy, seeing as they write a safety memo for a engineering company. They make fun of me incessantly for this, to the point where our Easter basket was a Home Depot bucket, decorated as a bunny no-less, full of chocolate and safety gear. Back to my original point of my ceiling cocktail. When I wear safety glasses and a dust mask, the glasses fog up. So which is more important: scratching a cornea, or breathing chunks of ceiling? I chose to keep my corneas intact at the expense of my lungs.
The highlight of the weekend wasn't having can lights working and fixing my electrical problem downstairs, it's that I didn't electrocute myself. It doesn't hurt that the can lights don't look half bad… Sure I'm behind schedule, but I don't really care at this point.
Posted by
Corey
at
2:45 PM
6
comments
Labels: Baltimore, demo, electrical, lighting, recessed lighting, rowhouse