My apologies for the lack of posts, but we've been busy with our engagement. I finally made an honest woman out of the Queen. From this point forward we are not living in sin. At least this is what we are going to tell ourselves. :-)
If you remember way back when I posted last we were going to be on HGTV. Well, the episode aired. We didn't win, but at least we didn't lose like the guys over at project rowhouse. (Actually, I think they won seeing as they didn't really spend $50k and did an amazing job on their place, but I don't want to say anything about that) After our loss the Queen and I headed over to project rowhouse to celebrate. They had a party going on, and it was great to hang out with Jon and Craig again.
If you missed the show, check out upcoming airtimes at hgtv's website for the episode and set the DVR. The next time it's on is October 13th at 9:30, and a few hours later at 12:30 am. Make sure to tune in and watch us look like fools.
P.S. All my links got wiped out somehow. I'll have to spend some time to reset them to their rightful place. :-(
Sunday, September 20, 2009
Fully Engaged
Posted by
Corey
at
6:41 PM
7
comments
Labels: Baltimore, hgtv, queen, renovation, rowhouse
Monday, January 5, 2009
Pictures of the Queen
This post has nothing to do with renovation, but I figured the Queen would smile when reading this post in the morning.
Posted by
Corey
at
11:55 PM
8
comments
Labels: photography, queen
Guest Bedroom Transformation
The last week and a half have been a whirlwind. I had off from Christmas Eve until today, allowing plenty of time to work on the house. And there is plenty of work to report. In the past week all of Leigh's family to help at one point or another, my mother and father drove in from Detroit to help out for a full week, my coworker helped lay wood floors, and I had contractors at the house for some of the time helping out too. So much work was completed that I can't cover it in one post. This post will document the transformation of the guest bedroom.
To start, you have to understand how horrible the room was when I moved in. The previous owner painted a beautiful mural in the room. My parents came to visit soon after I purchased the house and stayed in this second room. You can tell by the look on my father's face how much he enjoyed the mural.
By the time they left, a single coat of primer applied to hide the evil Medusa mural. It didn't hide it much, but at least Medusa was a bit subdued.
The room stayed this way until the Queen moved in. At that time, we needed a place to store her stuff while we renovated so the guest bedroom was turned into a storage shed.
Notice the cat in the middle of the room. She enjoyed the space just fine as a storage space.
As renovation progressed we've been able to slowly clear out this room. A few months ago I noticed one of the windows was broken. I knew this was a bad sign, as the window is on a 5' unsupported overhang of the house, so I figured this area was settling. When we ripped out the back wall a few weeks ago we discovered we had a bigger problem than I had previously thought. Termites.
In a matter of a few weeks we've come a long way.
Here is a rundown of the work done in the room.
A lot more work was done in the past week, and there is a lot more detailed explanation of the work done, but I'll save that for later. There is still some more work to be done in the room, like completing the trim and finishing the closet, but we are very pleased with the progress.
Thank you so much for everybody's help - words can't express our gratitude.
Posted by
Corey
at
9:51 PM
19
comments
Labels: Baltimore, demo, drywall, electrical, guest bedroom, hardwood floors, paint, queen, renovation, rowhouse, termites
Monday, December 1, 2008
Our Response to the Economic Downturn
In response to my post last week about how the economic downturn has affected you, here is how the economy has affected us.
1. We have a 100% financed house on an interest only loan. On the surface, this makes us a pretty high risk, at least from the current lender's perspective. I either had money for a down payment or for renovations. I chose to save on the down payment and monthly payments and put the money into renovations instead. A lot of people did this. I knew the housing market was souring, but I didn’t plan on making money on the house. I've only planned on learning how to renovate a home and hopefully be able to get out what I've put into it. Thus far, the money used for renovations has come from our bank accounts without the use of any loans. The debt we are currently carrying is some credit card debt, but no loans from other sources.
2. I had enough money for the kitchen renovation, but was planning on refinancing after this was complete and pulling out equity in order to fund the rest of the renovations. The economy fallout had begun, so I am not sure I would have been able to pull out the amount of money I needed. While I had put a lot of money into the house, refinancing has a lot of fees associated with it and the banks were no longer offering 100% financing. While I had effectively put a 20% down payment back into the house with the kitchen and downstairs bathroom renovation, the banks were moving toward 90% loan to value ratios and with refi fees I feared I wouldn't get back enough money to complete the renovation. I decided to finish the upstairs and refinance when the house was mostly done. The timeframe I made this decision was about the time the blog began, early this year. I am not sure this was the best decision to proceed on without refinancing, and it has caused a considerable amount of stress on us, but it's the path we have chosen.
3. The houses on both sides of me are both in trouble. One is in foreclosure, and the other one was in foreclosure (though I am not sure what state it is now). They are both rehabbed, though both not done particularly well. I am not certain what effect this has on me yet. It can't be good. The renovations I have made vastly exceed the quality of work in these other houses, but I am acutely aware that I could be overbuilding for the market. I am hoping that by doing a lot of work ourselves we will get most of the money out that we've put into it, but since we've paid cash out of hand for renovations thus far we are already invested. This means if we do move, we may not make much money but at least we most likely won't need to come to the closing table with a large check in hand.
4. The Queen's name is not currently on the mortgage. I've been waiting to refinance to do this, but renovations always take longer than expected (especially for such a large project like ours). I can't refinance until the house is almost done, as we want to be SURE that we have at least 20% of the home value into the home to avoid PMI and looking like we are high risk lenders.
5. What brought home the credit crisis to me was when I applied for a loan for the foundation work in the basement. Since the Queen's name isn't on the mortgage, I had to be the one to take out the loan. The loan was only for $2k. I was shocked when I was denied. My credit score is good (greater than 750), but I suppose the credit card debt coupled with a 100% financed interest only ARM made me too much of a risk for the loan. Also, without her being on the mortgage, from a credit perspective they don't see her as officially contributing to the mortgage thereby making it look like I am really in a bind. We found the money for the foundation work, but we would have liked to have a bit more cash on hand to continue with other work.
6. We seriously consider what renovations will really provide a return on investment. This pattern of thought has led us to do much of the work ourselves. Another example of potential cost/scope cutting is for us to reconsider digging out the basement to increase the height. It currently is about 6.5' of height, below the minimum 7' height for a habitable space. While we'd like to dig it out, a preliminary estimate (which is probably high) quoted us $45 a square foot to dig the space out. We'd only like about half of the space dug out, but this would still cost around $13k just for the dig. Add framing, electrical and moving things like plumbing and gas lines and the price only goes up. Now we're looking at just making the basement into a nice space without digging out. While it may not be perfect, it could work for a man cave. Other places that we talked about to save money on is the backyard. While I'd love something I planned out previously, it may just be overbuilding.
Going forward money will always be on the mind. While we'd love to make the house perfect, there is a point where it just has to be good enough. Finding that happy medium is the difficult part. Hopefully the money issues will work out OK in the coming months, but we are still proceeding on to finish what we’ve started. We have accepted that we are taking on short term debt, but feel that we are most of the way there and need to finish the main and second floor completely from a livability and a refinance perspective.
The next post I write will have pictures. Lots of pictures, because looking at all these words is boring me to tears.
Saturday, July 26, 2008
Drywalling Machine
Since drywalling is a pain in the butt, I figured the Queen should do it. Doesn't she look happy?
And for a random pic, here is my impression of an angler fish.
Pretty good, no?
Posted by
Corey
at
11:48 PM
2
comments
Labels: Baltimore, corey, drywall, master bedroom, queen, rowhouse
Thursday, July 10, 2008
The Queen Takes Her Throne
Or at least sells her cottage...
While Baltimore Rowhouse goes through a painfully sllooooooow renovation the Queen's condo has been on the market. 130 days after putting it on the market, it now has a contract on it. Woohoo!
Maybe I should finish the upstairs bathroom for the Queen's imminent arrival. :-)
*edit - I should spell check more often
Posted by
Corey
at
1:41 PM
5
comments
Thursday, May 15, 2008
Bad Blogger!
While real life has been exhilerating, work on the house is at a stand still. This weekend the Queen and I tackle painting downstairs and who knows what else. A 50" plasma arrives tomorrow, so we need to get the paint up so we can hang it and move on with life.
Since productivity sucks I can at least show you what Zion looked like. We already want to go back and hike the Narrows and the Subway.
Unfortunately we didn't make it to Antelope Canyon, but after driving uber-hours the day before we didn't feel like being in the car for 8 hours the next day. Hopefully next time we're out there we can stop by. :-)
Posted by
Corey
at
10:30 AM
7
comments
Labels: photography, queen, travel
Wednesday, April 23, 2008
Blame the Accountant
Yesterday I landed on the Community Chest square of life. Let me explain.
The (Beancounting) Queen is an accountant. She trusts me (wrongly) with all things enginerding, and I trust her on all things accounting. So the Queen did my taxes, and I got a little refund back. Nothing too much, but this was my first year of paying a full mortgage so I wasn't quite sure how big of a rebate check Uncle Sam owed me. It turns out that my employer made a boo boo on my W2's, and that I SHOULD BE GETTING ANOTHER $3,400 DOLLARS. Booyah!
Of course now that money is coming in I think for 5 seconds about how this can help me pay off debt, and 5 hours about all the cool stuff I can do with this money. While the bathroom upstairs requires some major love, I'm thinking maybe the backyard could be redone too? It is currently a 34'x13' slab of concrete, just waiting to be turned into a zen garden paradise. It just doesn't know it yet. I'm going to meet with some concrete guys to go over my fancy pants plan, and see how much they want to gouge me for. :)
While dreaming of a back yard I'm also hunting for houses with yards - I just can't give up on the idea of moving to a place with a pretty green yard. We have a conundrum of whether it's smarter to buy a house with a yard, or throw money at what I've got. Since we have to redo the upstairs bathroom before selling anyways, we potentially have time to redo the yard. It's just a matter of figuring out if this is worth throwing money and time at.
You know the hardest part about redoing a house? Knowing when to stop. Apparently I haven't learned yet.
- ++
Also, this last weekend the Queen had a meltdown. After saying things like, "we'll never finish" and "I'm glad we didn't get the cottage" she pulled herself back together and got to work. She later rescinded both comments. Things get a bit overwhelming at times, but we're slowly making progress... I was proud of her for getting back in the saddle quickly.
Posted by
Corey
at
4:34 PM
7
comments