I've been busy lately working on the house and haven't taken the camera out much. It was late and the light wasn't good but the 'rents have been asking for pictures, so pictures they get. It bugs me to take pictures with poor light, so I'll have to do a proper house photoshoot when the space is totally complete.
The bathroom is turning out well. It looked even better before I took a circular saw to the wall to cut a channel to run more electrical for some vanity lights, but I won't show you that. :)
And here is where the magic happens. Notice the lovely crown molding. I also decided not to throw a cabinet over the toilet or shelves next to it (yet).
Mom has been asking for a picture that shows the backsplash and the green wall. Throw in the new under cabinet lights and the crown molding and the kitchen is looking very nice...
I had the contractor wire upper and lower cabinet lights, but to save money I said I'd install the lights. For now I am just putting under the cabinet lights, and the jury is still out on uppers. After finishing the hook-up at midnight last night I turned on the lights in the bar and swooned for a while.
The foyer electrical still need to be fixed. All is well except figuring out how to get the ceiling fan on a switch. There are so many wires running through the area that the trouble shooting is taking a bit. The knee wall isn't drywalled yet as hauling materials like drywall and plywood in a maxima doesn't work so well.
Also, the table from Arhaus is on order and will be ours in a couple weeks, but the chairs were out of our price range. The craigslist hunt for chairs is on.
Tuesday, February 26, 2008
Under Cabinet Lights & Crown Molding
Posted by
Corey
at
10:15 PM
7
comments
Labels: Baltimore, craigslist, crown molding, downstairs bathroom, houseblogs, kitchen, lighting, renovation, rowhouse, under cabinet lights
Monday, February 25, 2008
Scheduling and Laser Beams
I get a strange pleasure each Monday when I update my Microsoft Project schedule. You see, being an engineer I have gotten used to scheduling and budgeting. To do both I use MS project to plan my future tasks, show their individual costs, and their dependencies on each other. Currently I have around 200 tasks, with more added daily to help define the level of detail where someone could actually complete the tasks. For instance, under the kitchen category are the tasks, 'prime', 'paint second coat', and 'paint second coat' which are all tasks that need to be done in series, and painting the trim is dependent on finishing the second coat of wall paint. Sure I don't follow all dependencies 100% and I start a lot of stuff before finishing something else, but the software helps act as a task list helping me to make sure that things don't fall through the cracks. Updating the progress on each task rolls up into the higher level task, so it gives a total percent complete of the whole renovation. While progress is slow, there is indeed progress.
A sample, not my actual schedule
Tasks completed this weekend were installing crown molding in the kitchen and bathroom, purchasing and mounting a towel bar & toilet paper holder in the bathroom, grouting the backsplash, starting the drywall touch ups on the bulging seams in the living room ceiling, and re-running electrical for the foyer. The electrical in the foyer doesn't really work yet and requires major trouble shooting, but at least the wire is run and conduit installed per code. I installed it Friday and then proceeded to avoid it for the rest of the weekend to temporarily avoid the frustration.
I would also like to provide Dadolescent & Momnipotent with the Highlandtown Hovel Baltimore Rowhouse award for outstanding achievement. I haven't figure out what exactly shape or form this award takes, so hopefully someone can provide some ideas. While I was suffering overload on Saturday night at around 6:30, they stayed at the house touching up the crown molding until 9:30, and then cleaning up the house too. I really can't express how much this means to me, and I am so lucky to have you help out with the house.
On other news I now have a plethora of tools. I went out and picked up a ryobi 18V lithium-ion 4 piece combo kit, which includes a drill/driver, circular saw, reciprocating saw & light for $270. I needed to buy tools, and it's lithium-ion-y good pulled me in.
After taking this home, a craigslist ad that I responded to emailed me back. He had a barely used 18V (not lithium-ion) kit including drill/driver, circular saw, rec. saw, jig saw, rotary tool, sander, light, batteries and a bag all for $140. I looked at it, and it's only been used a few times so I bought it. Now I have a conundrum whether to keep my new set, return it and keep the used set in it's entirety, or just sell of the parts of the old set that are redundant. Really, the tools look pretty much the same so I'd really just like the lithium ion batteries. And fyi, the circular saw in the used set comes with a laser. I like laser beams.