Showing posts with label closet. Show all posts
Showing posts with label closet. Show all posts

Sunday, November 30, 2008

Tying Up Loose Ends

Between bouts of eating turkey over the holiday we got some work done on the house. Luckily, this weekend was more productive than the last one. The main things accomplished were finishing up shelves for the new linen closet in the bathroom and staining the stair edging.

The teak floors have been sitting in the dining room since July. With all the other dirty work they haven't been a priority, but with the dirtier work is nearing an end we're focusing on the floors again. We didn't purchase stair nosing when we bought the wood, and par for the course, the wood in the stain we purchased has been discontinued. Similar pre-finished woods were running $9-13 a linear foot, we have 60 linear feet, and the finishes didn't match our wood anyways. I don't like paying astronimical prices for items that don't even match, so we decided to buy some $4 a linear foot unfinished maple and stain it ourselves. This weekend has been an interesting experiment of trying various wood stains on the nosing we bought. So far we are pleased with the match, but there are still 3 coats of polyurethane to put on the wood.

The wood shelves went into the linen closet ok. I had some leftover plywood laying around, so I used that for the shelves. On the front edge I used the finish nailer to add a piece of trim to give a cleaner and more durable edge. The shelves were then primed and painted, and are looking ab fab in the closet.

Other things accomplished this weekend were getting the foundation issue fixed, eating turkey, building some shelves for the basement, repairing the upstairs sink, sitting in front of a fire drinking irish whiskey, and going to the dump to rid ourselves of building supplies. Not too shabby.

Monday, October 20, 2008

Most productive weekend evar!

How did we go from this?

renovations 002

renovations 005

To this, in a weekend?

renovations 015

renovations 019

renovations 009

renovations 016

renovations 013

A lot of hard work by the Queen and her bro is what got it done.

The Queen and I had a three day weekend so we worked hard to get the drywall issues fixed. The drywall is laid over plaster. It was not attached to the plaster or the joists well and the mudding job was extremely poor. This took a lot of fixing to make things look ok. Sunday the Queen's bro came over to help us paint the place. It was a long day that ended at 10 pm, with the closets fully installed and the painting done.

Next up in the bedroom is some drywall fixing, laying subfloor and the teak. Things like doors and trim are luxuries we may not have time for in the near future, seeing as the contractor starts work on the bathroom this week. For part of the bathroom work I'll be working with the contractor, so we haven't completely let go of our DIY roots, but with a single full bathroom we need to work quickly to get a shower back online quickly.

Wednesday, October 8, 2008

Wally the Handyman

Wally has been hard at work renovating the house.

oct 08 057

He's grown a wee bit since we got him in August. He was a cute and cuddly 32 pounds and is now topping 50. We figure he's got at least another 50 to go. He's a goofy dog that is super smart, loves all dogs, people, kids and most of all loves us.

He's done a great job at taking a hodgepodge of doors and irregular surfaces on the bedroom wall, covering in the door to the closet from the hallway, and adding a doorway from the bedroom to the closet. He may not have an opposable thumb, but he's pretty good at drywalling.

untitled3

oct 08 052

Since this was taken he mounted a closet system and clothes are hanging in the space. The Queen is pleased, but now wants her closet complete ASAP.

Monday, September 29, 2008

Continuing the Closet Saga

Work continued this weekend on the closets. All of the drywall is up and the first coat of mud is complete on the new closet. While the new closet is very small at only 33" wide by 61" long, it is filled with seams so the Queen kept quite busy. It will make an awkward closet by the time we are done, but small spaces call for creative solutions. For now the plan is to install the Antonius closet system on the 33" wall (back of the closet) with clothes bars,



and float one or two Billy Bookshelf units on the 61" wall. It will be very tight, but we'll work with the space we have. In the end this will be my closet, and the Queen will get the second much larger closet.



This weekend I focused my attention on completing the wiring in the closets and running electrical for the bathroom. The plumbing rough in is done, and once electrical rough on the wall is done on we can mount the vanity.

Also, we are starting to get bids on having someone finishing the bathroom upstairs. I'm not pleased about having someone else do the job, but work has been crazy lately, leaving us with little time for renovations. We've been plugging away at things but at this pace the house will be done in 2015. Hopefully the bids come in low, as we have done a fair amount of the work already and are willing to help out more as work continues. I'd really like to find someone who is willing to work with us on this in order to contain costs. With the housing market the way it is it just isn't wise to go overboard with home spending.

Wednesday, September 17, 2008

Building a Carrie Bradshaw worthy Closet

Since the Queen has moved in she has been constantly sick with wheredoiputmystuffinthisgodforsakentornaparthouse-itis. The whole upstairs is in disarray, so finding room for her stuff has been a wee bit of an issue. In trying to cure her ailment we've destroyed more stuff, namely one of my closets, and are in the process of expanding it so we have two walk-in closets in the master bedroom.

untitled4

In this picture I am looking to the almighty for help. We need all the help we can get.