Basement Framing & Electrical Rough-In Complete

Now that we are under contract on the new place, the basement renovation kicks into high gear. Much like in December of 2008 when we decided to refinance our mortgage and creating a deadline to finish renovations, we are now in a similar position. We want our house occupied by a renter on 9/1. Yowza. With a basement under construction, a new house upcoming, a trip to Irelend, and finding out what the hell we need to do to rent the place the next month will be crazy. Time to kick things in gear...

In keeping with this, we are bringing in some help on the drywall. We got a bunch of quotes that were surprisingly reasonable. We ended up picking a mid-cost quote of a guy that I trusted. We then got him to throw in a bunch of extra work like hanging all the door jambs and doors and fixing a three switch that had gotten the best of me. An aside, when picking contractors, I usually go with my gut. This is never the high cost bidder, but usually someone at the mid to low end that will end up working with me a bit. This sometimes means quality is 90% instead of 100% but the lower costs have been things that I've been able to help fix.

Here is where we stand. Coming down the stairs, all the paneling, plaster and lathe, and most importantly the stairs were ripped out and recessed lights on a 3 way switch were put in. It looks great now.


Basement Reno - Framing & Electrical Rough-In

During the renovation it didn't look as good. I was hoping to keep the stairs as is, but after looking at them in detail they needed to be replaced. They literally bounced when you walked on them and were held up by about 6 nails total. Scary. Luckily, my amazing father agreed flew in from Detroit to help frame the basement and (little did he know at the time) replace the stairs. This basement would not be done if not for him. As you can see, the stairs were scary.

basement stairs

Walking to the bottom of the stairs and looking out things look much different than before. Before, it was a pile of crap.

dirty basement with captions

The view looks much better now. All the recessed lights are in, the plumbing lines and electrical to the second floor have all been rerouted to increase the headroom, and insulation is in place to help isolate the sound from the first floor living room.

Basement Reno - Framing & Electrical Rough-In

A look back at the stairs and portion of the remaining basement that will remain shows the recessed lights back in that area. I put the lights on a motion sensing/IR switch so when you walk in the space with your arms full of laundry you don't need to find a switch. We were talking about making a bar or closet in the area to the left but now that we are going to rent the space, this isn't a priority.

Basement Reno - Framing & Electrical Rough-In

To the right of the stairs is the framing around the HVAC. I added a small step at the bottom of the stairs to steer you toward the center of the room and away from the framing around the HVAC return. I was going to put a custom wine rack in this area, but again, this isn't a priority at this point. I added electricals circuit here in case I want to get fancy in the future with lighting the wine or potenially add a small bar over here.

Basement Reno - Framing & Electrical Rough-In

Walking a few steps forward, you can see more of what the living space will look like. A small closet is on the left, and I made a bench underneath the window to fill this dead space. On the right, there is a storage area that is accessed through the utility room door. Originally I was going to just do a soffit in this area, but the HVAC and water heater exhaust would still have been too low to make this area usable so I just closed this space in. The soffit change resulted swapping the seating area to the left instead of the right, but it shouldn't be that big of an issue.

Basement Reno - Framing & Electrical Rough-In

Looking back toward the stairs you can see this utility room. This room required moving the water heater to allow one door to be able to service the equipment while allowing space into the closet space to the left.

Basement Reno - Framing & Electrical Rough-In

While overall I don't like using contractors, it is nice to know that by the end of this week the drywall will be in and mudded and all doors hung. As I type, guys are loading drywall into the house. Hopefuly it will be hung with a first coat of mud in place by the end of today. :-)

Friday, July 22, 2011

The New Casa: A Sneak Peak

We considered buying a "shell" and having a contractor do the work to finish it. After we found this house for a good deal, we knew this was the house for us. Take a peak.

Here is the outside of the house, which is just fine. No great curb appeal. Since this picture was taken they painted the trim black and the door a nice gray.


front

Through the front door is the living room, with a small 1/2 bath on the right. The ceilings are 12-14' tall on this floor, so while this house is the same width as our (about 12' interior), the ceiling height helps make it feel larger.

living room

At the back of the house is the kitchen and dining room. The stairs of the house are in the middle, bisecting the space. Since they are an open stair it helps to make things still feel open. The kitchen has nice cabinets, counters, appliances, and a pretty good overall design.

kitchen 2

Here is the second floor layout, showing the two bedrooms each with their own bathrooms. Also, having the washer and dryer on this floor is pretty nice.

second floor plan

I can't pull the pics of the bedrooms into this post, but both they and the baths are pretty nice. Here is a sample of the bathrooms. Overall the tile quality is good in all of the 4.5 bathrooms. I don't know what we are going to do with all of those bathrooms, but the more the merrier?

back bed bath

The third floor is what we fell in love with. It is a master suite with the bedroom at the front, the master bath in the back, and a wet bar leading out to the rooftop deck. Here is the landing, looking forward toward the bedroom.

atrium 2

Turning around 180 degrees and you have the wetbar to the rooftop deck.

wet bar 2

There is a small deck landing on this level, and then up you go one more level to the main deck area. It has view of the harbor and will be great to watch fireworks from. :-)

rooftop deck

The front of the third floor is the master bedroom, with a nice big walk-in closet with a glass panel door. All the bedrooms have recessed lighting and ceiling fans, and the master has the nice coffered ceiling.

master bed

The master bath at the back of the third level has a double vanity, a soaking tub, and to the left of the vanity there is a stand up shower with a bunch of a jets and a floating glass door.

master bathroom

Also, the mancavebasement is fully finished and runs the length of the house. It also has a full bathroom, just in case I need to shower in my mancave. You never know...

basement stairs

We have a parking space in the back, but our one major thing we gave up with this house was a yard. :-( For more pictures of the house, including the full floor plans check out the virtual tour.

parking pad

Thus far, all things are heading smoothly, so hopefully all continutes to go well and we'll be moving in a little over a month.

Tuesday, July 19, 2011

Updated Mechanicals

After looking at the blog, I noticed a draft I never completed. So I finished it. :-)

Looking back to '08, I was considering a new HVAC system. Our system was old, energy usage was up, and the system wasn't keeping up with the heat and cold. I should have redone the system then. But I didn't. And it continued to get worse.

Last October the furnace went down, and since we were in a better financial position than we were in '08 we decided to update the system. Since we had issues with both the furnace and the A/C it was time to update both. I got quotes, and ended up going with a SEER 16 2.5 ton unit outside, and a 80% efficient gas furnace inside. All said and done the costs came in at $5100. We then got $600 in rebates from Rheem, $500 from the State of Maryland and an additional $350 from BGE. With the combination of the SEER 16 outdoor unit and 80% efficient indoor unit, we were also eligible for $1500 in tax credits. What originally was a ludicrous cost became a manageable cost, especially since replacing the equipment late in the year minimized the time between our payment and subsequent tax return. Also, by negotiating our deal in late fall the HVAC companies were looking for work which allowed us room to negotiate.

While the up front costs were high, overall it was a good decision that I wish we would have done sooner. I don't know if we will ever get the money back for this, but doing this change two years later than we should have cost us a lot in extra energy bills. If I had to do it all over again I would have done it sooner.

Also, as we were looking at the HVAC upgrades we realized our ducts were undersized. Especially our return ducts upstairs. We decided not to undertake this task yet, as we wanted to see how much just changing out the units helped. While it has definitely lowered our costs, at times I can tell we need more air changeover upstairs. In the long run I think this task is something that should be done, but for the next few years it is definitely on the back burner.

Monday, July 18, 2011

And the Saga Continues...

While some news of late hasn't been good, there have also been some positive developments too. The largest development as of late has been that we are now under contract for a new house. :-D

before reno


It is the three story house on the left. Isn't it beautiful? Yeah, not so much. But that is the before picture, and we are definitely purchasing this place in after condition. So, after renovating a house ourselves, why are we buying a renovated house, and more importantly why this house? Here are a few reasons:

    1. Some high end properties are going for cheap. Prices have dropped a lot in the past 5 years, and it is a great time to buy.
    2. Mortgage rates are really low. Low prices and low rates? Double awesome. After paying for the current house's renovations with cash on hand, we know major renovations require major cash on hand. Our cash, blood, sweat and tears are in the house already. We may be able to generate more sweat and tears but cash is hard to come by.
    3. Our 2 bed/1.5 bath won't magically sprout more bedrooms and bathrooms and overall square footage. While renovating the basement helps the value, it only helps to close the gap of making us competitive instead of just being overpriced for the size.
    4. After going back and forth for the last couple of years of city vs. burbs, we've found that despite higher taxes and increased crime we like cities. Also, most burbs houses we like require us selling our house and taking a hefty loss. I don't like taking losses.
    5. It has parking. The parking pad is essentially removing your backyard and replacing it with a parking space. Being in a city with mostly street parking and higher than average crime rates, having a guaranteed spot is important. We would have liked a yard AND a parking space, but most properties with both were coming in at $150-$200k more. Ouch.
    6. This house price allows us to get approved for this mortgage without selling our current house. While home prices and rates are low, rent in the city is increasing. A great time to buy means sellers are screwed. By not selling our property and getting decent rent we will have someone else pay off our house for us as the market improves.
    7. We are ready for something new. Hopefully this scratches our itch. :-D

Most importantly, I'm glad this blog will be able to continue, though probably more in a decorating/life updates stance versus a ohmygodicantbelieveimdestroyingthewholehouseblog. Hopefully this is ok.

At this point, we are hoping all contingencies are met and there aren't any issues that prevent the sale. We will keep our fingers crossed and hope for the best, and will keep you posted along the way.

P.S. I swear I'll post some pictures of the basement soon. It is framed, electrical run, and sound insulation in place. You'll have to trust me on this since there are no pictures.

Sunday, July 17, 2011

Dear Grandma

I'm sorry I didn't get a chance to say a proper goodbye. I was glad to hear that mom and dad were by your side when your time came and that it was peaceful. I'm also happy that after 31 years, you'll once again be reunited with Jerry. I wish I could have met him.


Grandma

I want to remember all the good stories and times past. Like in Hawaii how we drove around with Aunt Harriett on the hunt for the perfect Mai Tai. And how happy Leigh and I were that you made it to our wedding. Or how when I threw fishfood at your feet and you called me a little shit (you were right, I was). And when after the in-laws came to visit Michigan you begrudgingly told them they were alright. The thought of no new memories with you in them is a tough pill to swallow.

Grandma's Hands

While I wish I was there to say goodbye, most of all I'm just flat out going to miss you. I'm going to miss the sound of your giggle, the sight of you pushing your walker/chariot around with a martini on it, and your voice on a phone call. You always ended the call reminding me how proud you were of me. I was on cloud nine for the rest of the day, and Leigh and I would talk about how postively sweet you were. My heart keeps hoping you'll call but in my head I know that memories will have to suffice.

G-ma

G-ma - I'm glad that your pain is over, but I'm really going to miss you. And most of all I am proud to have known you.

Love,

Corey